250 tons passenger boarding bridge lifted on board

The heavy lift vessel Jumbo Kinetic is in Port of Trelleborg to load FMT’s passenger boarding bridges, which have been set up on the conventional quay since January.

On Thursday, 21 June, one of the boarding bridges was lifted on board and Port of Trelleborg was in place to view when the gigantic device was lifted.

Each device is 30 meters long, 20 meters high and weighs 250 tons.

On Friday 22 June, the second passenger boarding bridge will be lifted on board the vessel and then shipped to Port Everglades in the United States.

 FMT is a company in Trelleborg that designs and manufactures passenger boarding bridges, among other things, to airports worldwide.